This analysis is outdated. Please reanalyze.

Highlights

The AI used to provide these results are constantly improving. These results might change.

Quality


Better than with the fabric material type long lines.

Competitiveness


This leash has a swiveling caribiner which has withstood my dog’s spins thus far.

Overview

  • How are reviewers describing this item?
    good, material, great, tangled and through.
  • Our engine has profiled the reviewer patterns and has determined that there is minimal deception involved.
  • Our engine has discovered that over 90% high quality reviews are present.
  • This product had a total of 138 reviews as of our last analysis date on Apr 18 2021.

Helpful InsightsBETA

The AI used to provide these results are constantly improving. These results might change.

    Posted by a reviewer on Amazon

    Would not recommend for dogs who pull as this would not be safe nor sturdy enough


    Posted by a reviewer on Amazon

    The other dogs do not get tangled up bc the material just slides off of them


    Posted by a reviewer on Amazon

    I bought a 10 so we could work on some medium line work off leash

Review Count History
Loading...

Add Fakespot to your browser, Secure Shopping on the go.

Supported on Amazon, eBay, Walmart, Bestbuy, and many more.

Download Fakespot for Browsers
Download for the Chrome Web store
Download for Firefox Addons
1 million plus shoppers trust Fakespot