This analysis is outdated. Please reanalyze.

Pros & Cons

Update Pros and Cons
The AI used to provide these results are constantly improving. These results might change.

Pros

It allows us to use a long leash without the aggravation. Great for training recall and the price is unbeatable. Surprisingly good leash.

It gives confidence to both me and my pooch. Good for heavy breed dogs.



Cons

Not worth the money of purchasing it nor paying at the price of $20 bucks for a 30ft long leash. The springs in the clips have no resistance. Just not very durable.

Was this feature helpful?

Highlights

The AI used to provide these results are constantly improving. These results might change.

Quality


Not only that, but the quality of the long line itself is great as well.


It’s great quality works well does not get tangled.

Price


What you get for the price is outstanding!

Packaging/appearance


It allows us to use a long leash without the aggravation.

Competitiveness


This leash has a swiveling caribiner which has withstood my dog’s spins thus far.

Overview

  • How are reviewers describing this item?
    great, long, through, easy and material.
  • Our engine has profiled the reviewer patterns and has determined that there is minimal deception involved.
  • Our engine has discovered that over 90% high quality reviews are present.
  • This product had a total of 554 reviews as of our last analysis date on Jul 19 2022.

Helpful InsightsBETA

The AI used to provide these results are constantly improving. These results might change.

    Posted by a reviewer on Amazon

    Would not recommend for dogs who pull as this would not be safe nor sturdy enough


    Posted by a reviewer on Amazon

    The other dogs do not get tangled up bc the material just slides off of them


    Posted by a reviewer on Amazon

    Other clips have jammed on us


    Posted by a reviewer on Amazon

    I bought a 10 so we could work on some medium line work off leash


    Posted by a reviewer on Amazon

    We want to give her space to run but she’s not ready to be off leash


    Posted by a reviewer on Amazon

    If a dog is a heavy chewer etc it wont hold but no leash will so that doesnt affect my opinion about it


    Posted by a reviewer on Amazon

    Dont use it to tether a dog unsupervised though


    Posted by a reviewer on Amazon

    The media could not be loaded

Review Count History
Loading...

Add Fakespot to your browser, Secure Shopping on the go.

Supported on Amazon, eBay, Walmart, Bestbuy, and many more.

Download Fakespot for Browsers
Download for the Chrome Web store
Download for Firefox Addons
1 million plus shoppers trust Fakespot