Ask Fakespot Chat questions about this productAlpha
Add detailed feedback
Message
Loading suggested questions
Suggested Questions
Suggested Questions
No suggested questions were found
Pros & Cons
pros
See Details
pros
See Details
Waterproof Material
Customers are highly satisfied with the waterproof material of the leash, which is essential for them since they spend a lot of time around water and grassy areas. The leash performs well in various wet conditions and is lightweight and not slippery.
Durable Handle
Customers are highly satisfied with the durability of the handle on this waterproof dog training leash, praising its strength, comfort, and ease of use for various training purposes.
Versatile Length Options
Customers are highly satisfied with the versatile length options of the Waterproof Dog Training Leash, allowing them to effectively train their dogs in various situations and environments. The different lengths cater to various training needs and provide flexibility for controlling and managing their pets.
Strong Webbing
Customers highly praise the strong webbing of the leash, which is essential for handling larger dogs during training or walks. The leash's ability to wipe down easily and withstand heavy use in various environments, including grassy areas and near water, is also appreciated by many. Some customers have noted that the leash may acquire nicks and cuts but consider it a reasonable trade-off for its durability.
Highlights
Quality
I absolutely love this long lead and great quality so far!
It's very sturdy and works great in all weather.
The material it is made of is soft, lightweight and it does not absorb water.
I actually had to borrow this check cord at a hunting training because the one i had was leaving rope burns on my hands.
Price
This is a more affordable leash that wipes down clean, just like the biothane ones you’d get other places.
1/3 less in proce than off of the dog supply store website my husband wanted me to order from andnits the same thing.
Overview
- How are reviewers describing this item?
great, long, easy, color and good. - Our engine has profiled the reviewer patterns and has determined that there is minimal deception involved.
- Our engine has discovered that over 90% high quality reviews are present.
- This product had a total of 1,560 reviews as of our last analysis date on Sep 24 2024.
Helpful InsightsBETA
Posted by a reviewer on Amazon
I thought this was a nylon braided leash
Posted by a reviewer on Amazon
I got the pink 10ft leash for my dog
Posted by a reviewer on Amazon
I love that its waterproof but the down side to that is it gets extremely slippery when wet
Posted by a reviewer on Amazon
Not a big issue if using this leash for hikes or training but definitely not good if you need to shorten the amount of slack near cars or people
Posted by a reviewer on Amazon
But to roll it up to keep it is a bit cumbersome
Posted by a reviewer on Amazon
Just very heavy for our smaller dog
Posted by a reviewer on Amazon
We gave it to our daughter who has a shepherd
Posted by a reviewer on Amazon
Nice product but rather heavy for small dogs especially if you get a long one for training
Review Count History
Price History
Ask Fakespot Chat questions about this productAlpha
Add detailed feedback
Message
Loading suggested questions
Suggested Questions
Suggested Questions
No suggested questions were found