Pros & Cons
Pros
It's sturdy, made well, the latch is great!
Great for training recall. And the price is unbeatable. Very happy with this purchase. Surprisingly good leash.
Cons
Not worth the money of purchasing it nor paying at the price of $20 bucks for a 30ft long leash. The springs in the clips have no resistance. Just not very durable.
Highlights
Quality
Not only that, but the quality of the long line itself is great as well.
It's high quality and, of course, waterproof.
Price
What you get for the price is outstanding!
Packaging/appearance
It allows us to use a long leash without the aggravation.
Competitiveness
This leash has a swiveling caribiner which has withstood my dog’s spins thus far.
Overview
- How are reviewers describing this item?
great, long, through, easy and material. - Our engine has profiled the reviewer patterns and has determined that there is minimal deception involved.
- Our engine has discovered that over 90% high quality reviews are present.
- This product had a total of 514 reviews as of our last analysis date on Jun 14 2022.
Helpful InsightsBETA
Posted by a reviewer on Amazon
Would not recommend for dogs who pull as this would not be safe nor sturdy enough
Posted by a reviewer on Amazon
Dont use it to tether a dog unsupervised though
Posted by a reviewer on Amazon
Other clips have jammed on us
Posted by a reviewer on Amazon
The other dogs do not get tangled up bc the material just slides off of them
Posted by a reviewer on Amazon
If a dog is a heavy chewer etc it wont hold but no leash will so that doesnt affect my opinion about it
Posted by a reviewer on Amazon
We want to give her space to run but she’s not ready to be off leash
Posted by a reviewer on Amazon
The media could not be loaded